One of the questions we are often asked by clients embarking on a building project is ‘how long will it take?’

At Kimble Roden we guide our clients through every step of the process, from start to finish and whilst we are all eager to start on site, it is essential to plan ahead to ensure a smooth project delivery.

In our latest blog we discuss the key stages of the project delivery and how each stage affects the overall programme together with how long your building project will take from start to finish.

Initial Design

The first stage of your project is to define your brief – what exactly are you trying to achieve with your project. By taking time to consider what you really want, you will avoid regrets further down the line.

At Kimble Roden we will help you develop a detailed briefing document and advise you on how to maximise your budget – from high level decisions like how many bedrooms you need, down to more specific requirements like storage or specialist kitchen equipment. All of these requirements will dovetail into a design solution tailored precisely for you.

Once the brief is agreed, initial design solutions need to be developed. This is where the skill set of a qualified RIBA architect will be invaluable to you and help you maximise design potential for your home.

By providing you with fully considered plans, elevations and 3D walk-throughs your architect will be able to provide a design solution that considers your brief, your budget, your existing home and the planning constraints and sets the foundation for the overall design.

Stage length – 1-2 months.

Planning stage

Once you have agreed the principles of the design, your architect will submit a planning application on your behalf.

Using an architect for this stage will ensure the local planning authority has all the necessary information to process your application.

A householder application should take on average 8 weeks to be approved once validated. However, delays to the planning process are evident across the country so be prepared to wait longer for a decision.

Kimble Roden Planning Drawings

Kimble Roden have a 100% record in planning approvals, so we can give you the expert help to minimise the time it takes to get an approval.

Stage length 2- 4 months.

Detail Design

With planning approval in place there is one final stage before commencement on site – the detail design stage where your architect will produce a full set of construction drawings and interior packages to enable a contractor to quote for the project, and crucially to ensure that every detail is considered before you start on site.

We understand the importance of this stage. We prepare detailed construction drawings and interior design packages. This includes full architectural design specifications and a comprehensive set of tender information, enabling us to obtain fixed quotes from our recommended builders.

Kimble Roden Detailed Design

As part of this process, we will also obtain approval for Building Regulations before work starts on site and we will hold meetings with suppliers during the construction phase to ensure everything runs as smoothly as possible.

Stage Length – 2-3 months:

Tender Stage and Finding the right contractor.

Your RIBA architect should be able to introduce you to recommended builders and liaise with them during the tender stage. At Kimble Roden this is part of the service we provide to all of our clients.

The comprehensive set of information we have prepared at the Detail Design stage enables contractors to provide a fixed contract price. Once you have chosen the contractor and negotiated the contract sum a contract document will be prepared between you and the contractor.

Stage Length – 1 month:

Construction – the final stage of your project

At Kimble Roden we oversee the entire build stage to give you complete peace of mind and ensure that your project is delivered in line with your vision and the drawings we worked together to create.

We will make regular site visits and check that everything is being built in accordance with the drawings. Our team will also liaise with building control and other relevant bodies to ensure a Building Control Certificate is awarded at the end of your project.

Stage Length (depending on scope of project) – 6 - 18 months.

Taking time to plan your project to ensure the design solution meets your brief and vision, all of the details are correct and all of your statutory approvals are in place is the key to success.  In addition, you will also be able to control the budget and ensure there are no nasty surprises.

Kimble Roden has a well structured delivery process that ensures a high quality result every time - How We Work

By employing a RIBA chartered architect, you will have peace of mind throughout and will be able to enjoy the process of making your vision a reality.

If you would like to discuss your project with us, please call +44 (0) 1625402442 or EMAIL us for a free initial consultation.

If you are looking for more inspiration then we welcome you to view our Portfolio HERE

Contact Us To Discuss Your Project

For a no obligation consultation call 01625 402442

Contact Us